2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩12頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、Procedia Engineering 32 (2012) 25 – 371877-7058 © 2012 Published by Elsevier Ltd. doi:10.1016/j.proeng.2012.01.1233Available online at www.sciencedirect.comI-SEEC2011Urban flood disaster management T. Tingsanchali?P

2、rogram of Civil and Environmental Engineering, Faculty of Science and Technology, Nakhon Pathom Rajabhat University, Nakhon Pathom, 73000, Thailand Elsevier use only: Received 30 September 2011; Revised 10 November 201

3、1; Accepted 25 November 2011. Abstract Flood impact is one of the most significant disasters in the world. More than half of global flood damages occur in Asia. Causes of floods are due to natural factors such as heavy

4、 rainfall, high floods and high tides, etc., and human factors such as blocking of channels or aggravation of drainage channels, improper land use, deforestation in headwater regions, etc. Floods result in losses of li

5、fe and damage properties. Population increase results in more urbanization, more impervious area and less infiltration and greater flood peak and runoff. Problems become more critical due to more severe and frequent fl

6、ooding likely caused by climate change, socio-economic damage, population affected, public outcry and limited funds. Flood loss prevention and mitigation includes structural flood control measures such as construction

7、of dams or river dikes and non-structural measures such as flood forecasting and warning, flood hazard and risk management, public participation and institutional arrangement, etc. This paper describes concepts, policy

8、, plan and operation on integrated urban flood disaster and risk management. In most developing countries, flood disaster management activities are handled by government. Participation of non- governmental agencies and

9、private sectors are very limited. Activities are exercised rather independently without proper coordination or integration. Flood disaster management in developing countries is mostly reactive responding to prevailing

10、disaster situations (emergency response and recovery). Reactive response should be changed to proactive response to increase effectiveness of management and reduce losses of life and properties. Proactive disaster mana

11、gement requires more participation from various governments, non-governmental and private agencies and public participation. It involves more effort and time, more budget, equipments, facilities and human resources wh

12、ich leads to integration of flood disaster management for both long term and short term activities. Strategic framework on integrated flood disaster management includes four cyclic steps namely: 1) preparedness before f

13、lood impact such as flood forecasting and warning; 2) readiness upon flood arrival; 3) emergency responses during flood impact and; 4) recovery and rehabilitation after flood impact. Examples on urban flood disaster an

14、d risk management in Thailand are illustrated and discussed. Conclusions and recommendations for further improvement are provided. © 2010 Published by Elsevier Ltd. Selection and/or peer-review under responsibility

15、 of I-SEEC2011 Keywords: Urban floods; Flood disaster management; Flood control measures; Risk management; Thailand * Corresponding author. E-mail address: tawatch_t@hotmail.com. Open access under CC BY-NC-ND license.Ope

16、n access under CC BY-NC-ND license.27 T. Tingsanchali / Procedia Engineering 32 (2012) 25 – 37Fig. 1. Flooding in Bangkok in 2002 (above) and Had Yai City in 2000 (below) October 2, 2002 Bangkok traffic in Chaos as City

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論